User Tag List
Results 1 to 10 of 10
-
Sat, Mar 18th, 2017, 06:01 PM #1
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
In Hamilton:
Stoney Creek/Winona area
https://www.hamiltonnews.com/news-st...-for-2-months/
East Hamilton Mountain-Upper Sherman Avenue
https://www.hamiltonnews.com/news-st...begins-monday/
Claremont Access & Sherman Access
https://www.hamilton.ca/node/41751
https://www.hamilton.ca/streets-tran.../road-closures
In Ancaster this week, crews have been putting hydro poles into the ground after holes have been dug. Road construction is certain to start soon. Wilson Street West.This thread is currently associated with: N/A2021-Bring on the sunshine, sweets & online shopping.
-
-
Sat, Mar 18th, 2017, 06:02 PM #2
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
In Burlington, near the Central Library:
https://www.bpl.on.ca/new-drury-roadwork#20172021-Bring on the sunshine, sweets & online shopping.
-
Wed, Mar 22nd, 2017, 10:10 PM #3
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
Spotted sign on utility pole, westbound on Rymal Rd W at West 5th St. (Hamilton Mountain)
Lane restrictions between Garth St. and Upper Paradise March 27 to October. Expect delays.
(So the two lanes in each direction plus centre turn lane will be made reality this year.)2021-Bring on the sunshine, sweets & online shopping.
-
Fri, Apr 7th, 2017, 05:29 PM #4
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
Starting the evening of April 18, the eastbound lanes of the 403 between Mohawk Road and Wilson Street West exits will have nightly lane closures.
Signs are on Wilson Street West in Ancaster near the Hwy 403 on-ramps.2021-Bring on the sunshine, sweets & online shopping.
-
Thu, May 11th, 2017, 01:10 PM #5
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
Dartnall Road, from Stonechurch Rd to Rymal Rd E (Hamilton) beginning May 15 until December 2017:
https://www.hamilton.ca/government-i...-monday-may-152021-Bring on the sunshine, sweets & online shopping.
-
Wed, Jun 28th, 2017, 10:19 AM #6
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
If you have travelled in the Garth St. and Rymal Road West area over the past three years, you may be thrilled to know that the St. Elizabeth Mills project will start next year. There's hope for eventual end to the construction in the area...as a pedestrian, I look forward to it!
https://www.hamiltonnews.com/communi...n-next-spring/2021-Bring on the sunshine, sweets & online shopping.
-
Tue, Jul 4th, 2017, 03:58 PM #7
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
Dartnall Road, between Rymal Road and Stonechurch Rd, will be closed for four months of work.
https://www.hamiltonnews.com/news-st...e-replacement/
West leg of Sherman Access is also closed for four months.
https://www.hamiltonnews.com/news-st...r-four-months/2021-Bring on the sunshine, sweets & online shopping.
-
Thu, Jul 27th, 2017, 11:08 AM #8
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
Stonechurch Rd. W. at Garth Street-road reconstruction until mid-August. Bus & road detours are in effect.
https://www.hamiltonnews.com/news-st...l-late-august/
Drivers will be ticketed if caught driving on closed section of Wilson St. W. between Valleyview Dr/Amberly Blvd to Seminole Rd. in Ancaster. 16-Ancaster bus is detouring from Amberly via Cavendish/Hamilton Dr to Meadowbrook for the summer (in both directions). Sidewalk on south side of Wilson W is messy and some construction excavations are on properties as well as city allowances. Avoid.
https://www.hamiltonnews.com/news-st...treet-project/Last edited by Ciel; Thu, Jul 27th, 2017 at 11:11 AM.
2021-Bring on the sunshine, sweets & online shopping.
-
Tue, Aug 22nd, 2017, 12:19 PM #9
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
Ancaster-Wilson St. W. road construction continues until November. New asphalt and sidewalks have been put down between Meadowbrook dr and Valleyview Dr-not obvious if the lighted pedestrian crossing and intersection will be finished in time for school starts in September. HSR bus 16-Ancaster remains on detour (keep seeing people wait at the eastbound Fortinos bus stop which is out of service).
Montgomery Drive construction continues. Crews found hard rock under their work area, so that is delaying progress.
https://www.hamiltonnews.com/news-st...d-a-few-weeks/
Hamilton road closures:
https://www.hamilton.ca/streets-tran.../road-closures
403 ramp closures nightly: http://www.mto.gov.on.ca/english/tra...hamilton.shtml2021-Bring on the sunshine, sweets & online shopping.
-
Thu, Aug 24th, 2017, 10:08 AM #10
- Join Date
- Jul 2009
- Location
- Ontario
- Posts
- 17,846
- Likes Received
- 24776
- Trading Score
- 12 (100%)
Avoid driving down the closed part of Wilson St. W. in Ancaster. Yes, the roundabout end got some new asphalt and just done sidewalks almost to Amberly Blvd but past that intersection east, there are multiple big open trenches and exposed pipes on the north side of the road and sidewalks have been removed. The sidewalks are like trails of various elevations with dropoffs-be careful.
Noticed the sidewalks along Rymal from Upper Wentworth to Upper Paradise are mostly updated. Really happy to see sidewalk on the Airport Ford dealership property as most pedestrians were walking on the lawn during wet conditions to avoid the narrow strip of shoulder at the road edge.Last edited by Ciel; Thu, Aug 24th, 2017 at 10:09 AM.
2021-Bring on the sunshine, sweets & online shopping.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)